Driving Successful Document Management in Construction

Before construction projects were digitally collaborated on, document control was a complete nightmare. One contractor might have an older spec sheet, another might have the updated one but it’s back in his office, the engineer might have gotten lost in the updates, and ultimately key components of the project might end up being delayed or constructed incorrectly. Proper construction document management with a project management information system (PMIS) eliminates version confusion, access issues, and wasted time. Come hear from customers about life after their move to taming the chaos of document sharing.

For more information on the topic of construction document management, read our blog post, The Ultimate Guide to Construction Documentation.

No Previous Videos

Next Video
What Happens Next Part 2: Changes to Contracting, Risk Management and Productivity
What Happens Next Part 2: Changes to Contracting, Risk Management and Productivity

What happens next? While Episode #1 explored what to expect, Episode #2 focused on what will need to be don...