The Washington Suburban Sanity Commission has been at the cutting edge of technology for nearly 15 years by leveraging cloud-based construction management software
Previous Video
City of Kansas City, MO Case Study
Next Video
Capital Project Delivery Maximized at the City of Miami Beach
David Martinez, Acting Director for the City of Miami Beach's Capital Improvements Program, talks about the...
City of Edmonton - A Growing City Needed A PMIS to Get to the Next Level
In 2018, the City of Edmonton, Alberta, Canada adopted e-Builder Enterprise’s cloud-based project management controls solution to manage their multi-billion-dollar capital program.
City of Fort Smith Enhanced Efficiency With a Cloud-Based PMIS
Learn how the city of Fort Smith Utility Department is implementing a compliance program estimated to include $480 million of sewer upgrades over 12 years with e-Builder's help.
Currently, the Illinois Tollway is working on “Move Illinois” a 15-year, $14 billion capital improvement program that will increase mobility, and reduce congestion and pollution, all while bringing ab
Pennsylvania, Department of General Services (PADGS)
As a construction professional, whether in the Public or Private sector, chances are you feel the pressure of Doing More with Less and the need to modernize your capital construction program.
Learn
<p><b>“ Prior to e-Builder, it was all a manual database entry so we are now saving a lot of time.”</b></p><hr /><p><br>Linda Shilley, Contract Adminstrator<br>Port of Olympia
Port of Olympia Teams with e-Builder to Eliminate Spreadsheets
Port of Olympia reduced the time spent entering project information into spreadsheets or databases by 50%, the average document retrieval time is now less than 3 minutes. Read the customer story!
Metropolitan Council Managing Project Risks through the Establishment of Effective Project Controls
e-Builder's integrated capital project management software is helping the Metropolitan Council of the Twin Cities area, streamline construction processes. Download the Customer Story for more!
Washington Suburban Sanitary Commission (WSSC) Saved $330K/year
e-Builder offers Washington Suburban Sanitary Commission the flexibility to access the system from virtually any place at any time, which is a huge advantage. Read the Customer Story!
CATS is looking to use e-Builder to improve project forecasting reports and revamp the dashboards currently being used for high level reporting. Read more in the Customer Story!
City of Norfolk Department of Public Works Cloud-Based Processes Streamline Multi-Million Dollar Capital Program
The Norfolk Department of Public Works Design Division procures and manages design and construction for approximately $61.1 million in Capital Improvement Program (CIP) projects. Read the story.
Arlington County, VA talks about their use of e-Builder Enterprise
Scattered data brought an intense challenge of keeping track of all their construction project's information. By implementing a project management information system like e-Builder, Arlington County i
The City of Arlington Improving customer and stakeholder transparency
The city of Arlington's project inspectors no longer rely on daily, handwritten diaries and calendars of project site visits to complete their reports. Read the full customer story!
Metropolitan Sewer District of Greater Cincinnati (MSD)
Metropolitan Sewer District’s challenge was to establish a streamlined automated solution that is compliant with MSD’s policies and guidelines in terms of documentation and e-Builder solution helped.
Sunnyvale Public Works Department/ Engineering Division
The Sunnyvale Public Works Department (SPWD) is charged with maintaining and upgrading city facilities and infrastructure and e-Builder help them improve process to achieve their goals. Read more!
Located in the heart of Silicon Valley, the City of Sunnyvale needed a progressive, digital solution to manage their capital program. The city has seen huge improvements, especially through their Subm
Capital Project Delivery Maximized at the City of Miami Beach
David Martinez, Acting Director for the City of Miami Beach's Capital Improvements Program, talks about the city's use of construction program management software to improve capital project delivery.
Linda Shilley, Contract Administrator at the Port of Olympia in Washington, discusses their use of e-Builder and achieving streamline control of documents, budgets, commitments, financials and much mo